Location : Suncheon-si, Jeollanam-do
Project Type : Playground
Design Period : 2020.06.~2020.09.
Construction Period : 2021.01.~2021.04.
Site Area : 1,400.00(㎡)
Photo : Kim Do Hyeon
'Projects' 카테고리의 다른 글
[Inhun High School '더불어 숲 아고라 광장'] (0) | 2021.12.22 |
---|---|
[Samseo Elementry School '꿈트리하우스'] (0) | 2021.10.08 |
[Silim High School '함께꿈' Toilet Remodeling] (0) | 2021.06.03 |
[Ulsan Muryong High School 'The House'] (0) | 2020.02.24 |
[Nangok Elementary School '함께꿈' Toilet Remodeling] (0) | 2018.12.20 |