Location : Jangheung-gun, Jeollanam-do
Project Type : Renovation
Design Period : 2023.06.~2023.10.
Construction Period : 2024.02.~ 2024.04.
Gross Floor Area : 573.12(㎡)
Work Scope: Schematic Design.
Photo : Kim Do Hyeon
'Projects' 카테고리의 다른 글
[Nampyeong Middle School Dado Branch '다도별생각숲'] (0) | 2024.04.03 |
---|---|
[Noannam Elementry School 'VIVA Playground'] (0) | 2024.04.02 |
[Seorabeol High School 'Project Classroom'] (0) | 2024.02.20 |
[Myeondong Elementry School '꿈을 담은 놀이터'] (0) | 2024.02.19 |
[Gwangjin Elementry School '꿈을 담은 놀이터'] (0) | 2023.12.21 |