Location : Dongjak-gu, Seoul
Design Period  :  2016.05.~2016.06.
Construction Period  :  2016.08.~2016.11.
Area  :  144(㎡)
Design Director  :  Kim Dohyeon
Construction  :  Lee Yongwoo
Picture  :  Kim Dohyeon
-Before&After-
0123456789
-Plan-
-Design Workshop-
'Projects' 카테고리의 다른 글
| [Silim High School '함께꿈' Toilet Remodeling] (0) | 2021.06.03 | 
|---|---|
| [Ulsan Muryong High School 'The House'] (0) | 2020.02.24 | 
| [Vatican City International Exhibition ‘땅에서도 이루어지소서’ ] (0) | 2018.12.14 | 
| [Yeongdeungpo Middle School '함께꿈' Toilet Remodeling] (0) | 2018.12.14 | 
| [염창동아3차APT 인테리어] (0) | 2018.12.14 |