Location : Dongjak-gu, Seoul
Design Period : 2016.05.~2016.06.
Construction Period : 2016.08.~2016.11.
Area : 144(㎡)
Design Director : Kim Dohyeon
Construction : Lee Yongwoo
Picture : Kim Dohyeon
-Before&After-
-Plan-
-Design Workshop-
'Projects' 카테고리의 다른 글
[Ulsan Muryong High School 'The House'] (0) | 2020.02.24 |
---|---|
[Nangok Elementary School '함께꿈' Toilet Remodeling] (0) | 2018.12.20 |
[Vatican City International Exhibition ‘땅에서도 이루어지소서’ ] (0) | 2018.12.14 |
[Yeongdeungpo Middle School '함께꿈' Toilet Remodeling] (0) | 2018.12.14 |
[염창동아3차APT 인테리어] (0) | 2018.12.14 |