Projects

[Yeongdeungpo Middle School '함께꿈' Toilet Remodeling]

 

Location  :  Dongjak-gu, Seoul

Design Period  :  2017.04.~2017.05.
Construction Period  :  2017.09.~2017.11.
Area  :  206.62(㎡)
Design Director  :  Kim Dohyeon
Construction  :  GROW

Picture  :  Kim Dohyeon

 

-Before&After-

01234567891011

 

 

-Plan-

 

 

 

 

-Design Workshop-