Location : Gangseo-gu, Seoul
Design Period : 2016.11.~2016.12.
Construction Period : 2016.12.~2016.01.
Area : 72.29(㎡)
Construction : SD interior
Picture : Kim Dohyeon
-Before&After-
'Projects' 카테고리의 다른 글
[Ulsan Muryong High School 'The House'] (0) | 2020.02.24 |
---|---|
[Nangok Elementary School '함께꿈' Toilet Remodeling] (0) | 2018.12.20 |
[Vatican City International Exhibition ‘땅에서도 이루어지소서’ ] (0) | 2018.12.14 |
[Yeongdeungpo Middle School '함께꿈' Toilet Remodeling] (0) | 2018.12.14 |
[Yeongdeungpo Middle School '함께꿈' Toilet RemodelingⅠ ] (0) | 2018.12.14 |